{"id":1834,"date":"2026-10-16T07:23:53","date_gmt":"2026-10-16T07:23:53","guid":{"rendered":"https:\/\/vboltoilrecycling.com\/?p=1834"},"modified":"2026-10-16T08:09:41","modified_gmt":"2026-10-16T08:09:41","slug":"%d1%81%d1%82%d0%be%d0%b8%d0%bc%d0%be%d1%81%d1%82%d1%8c-%d1%83%d1%81%d1%82%d0%b0%d0%bd%d0%be%d0%b2%d0%ba%d0%b8-%d0%bf%d0%be-%d0%b4%d0%b8%d1%81%d1%82%d0%b8%d0%bb%d0%bb%d1%8f%d1%86%d0%b8%d0%b8-%d0%be","status":"publish","type":"post","link":"https:\/\/vboltoilrecycling.com\/ru\/waste-oil-distillation-plant-cost\/","title":{"rendered":"\u0421\u0442\u043e\u0438\u043c\u043e\u0441\u0442\u044c \u0443\u0441\u0442\u0430\u043d\u043e\u0432\u043a\u0438 \u043f\u043e \u0434\u0438\u0441\u0442\u0438\u043b\u043b\u044f\u0446\u0438\u0438 \u043e\u0442\u0440\u0430\u0431\u043e\u0442\u0430\u043d\u043d\u043e\u0433\u043e \u043c\u0430\u0441\u043b\u0430: \u0441\u0442\u043e\u0438\u043c\u043e\u0441\u0442\u044c \u043e\u0431\u043e\u0440\u0443\u0434\u043e\u0432\u0430\u043d\u0438\u044f \u043f\u043e \u0441\u0440\u0430\u0432\u043d\u0435\u043d\u0438\u044e \u0441 \u043e\u0431\u0449\u0438\u043c \u043e\u0431\u044a\u0435\u043c\u043e\u043c \u0438\u043d\u0432\u0435\u0441\u0442\u0438\u0446\u0438\u0439"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">For a waste oil distillation project, the more useful budgeting question is not simply how much the machine costs, but how much of the complete project still has to be built around it.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">That answer can be very different from one customer to another. Some sites already have suitable tanks, utilities and operating infrastructure, while others need a much broader project scope before production can begin.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article focuses on that difference: <strong>how the condition of the existing site changes the real investment required around the distillation equipment.<\/strong><\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/vboltoilrecycling.com\/wp-content\/uploads\/2026\/07\/continuous-waste-oil-distillation-plant.webp\" alt=\"Continuous waste oil distillation plant in operation\"\/><figcaption class=\"wp-element-caption\">\nA waste oil distillation line is only one part of the complete project. The final investment depends on what is already available at the installation site.\n<\/figcaption><\/figure>\n\n\n\n<details id=\"rank-math-toc\" open>\n  <summary class=\"toc-header\">\n    <span class=\"toc-title\">Table of Contents<\/span>\n    <span class=\"toc-arrow\" id=\"tocArrow\">\u25b4<\/span>\n  <\/summary>\n\n  <nav>\n    <ul>\n      <li><a href=\"#same-equipment\">The Same Equipment Can Mean a Different Total Investment<\/a><\/li>\n      <li><a href=\"#existing-site\">Start With What Your Site Already Has<\/a><\/li>\n      <li><a href=\"#equipment-vs-project\">Equipment Price vs Remaining Project Scope<\/a><\/li>\n      <li><a href=\"#project-check\">A Simple Pre-Quote Project Check<\/a><\/li>\n      <li><a href=\"#vbolt-review\">How VBOLT Reviews the Project Scope<\/a><\/li>\n      <li><a href=\"#faq\">Frequently Asked Questions<\/a><\/li>\n    <\/ul>\n  <\/nav>\n<\/details>\n\n\n\n<h2 id=\"same-equipment\" class=\"wp-block-heading\">The Same Equipment Can Mean a Different Total Investment<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Consider three customers planning a similar waste oil distillation line.<\/p>\n\n\n\n<div class=\"vbolt-table-wrap\">\n<table class=\"vbolt-project-table\">\n<thead>\n<tr>\n<th>Project Situation<\/th>\n<th>Existing Facilities<\/th>\n<th>What Still Needs to Be Added<\/th>\n<\/tr>\n<\/thead>\n\n<tbody>\n<tr>\n<td><strong>Waste oil collector adding processing<\/strong><\/td>\n<td>Feed tanks, unloading area, operators, basic utilities<\/td>\n<td>Main process equipment and selected connections<\/td>\n<\/tr>\n\n<tr>\n<td><strong>Existing industrial facility<\/strong><\/td>\n<td>Power, workshop, cooling system and part of the site infrastructure<\/td>\n<td>Distillation equipment, oil storage and process connections<\/td>\n<\/tr>\n\n<tr>\n<td><strong>New recycling project<\/strong><\/td>\n<td>Limited existing infrastructure<\/td>\n<td>Equipment plus most of the supporting site facilities<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">All three customers may request the same nominal capacity.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">But their total investment will be different because the amount of new infrastructure required is different.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This is why a machine price found online cannot be used as a complete project budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Customers who first want to understand the main equipment configuration can review our <a href=\"https:\/\/vboltoilrecycling.com\/waste-oil-to-diesel-distillation-plant\/\" target=\"_blank\" rel=\"noopener\"><strong>Waste Oil to Diesel Distillation Plant<\/strong><\/a>.<\/p>\n\n\n\n<h2 id=\"existing-site\" class=\"wp-block-heading\">Start With What Your Site Already Has<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">For an existing waste oil or industrial facility, the first question should be:<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Which parts of the project are already available and suitable for reuse?<\/strong><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A practical site check normally includes:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>feedstock storage tanks;<\/li>\n\n\n\n<li>product storage tanks;<\/li>\n\n\n\n<li>electrical capacity;<\/li>\n\n\n\n<li>heating source;<\/li>\n\n\n\n<li>cooling system;<\/li>\n\n\n\n<li>equipment installation area;<\/li>\n\n\n\n<li>operators and maintenance staff.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">If several of these are already available and suitable, the customer may mainly need the process equipment and its connections.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">If the project starts from an empty site, much more work remains outside the equipment package.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This distinction is especially important for waste oil collection companies that are moving from storage and resale into their own processing operation.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/vboltoilrecycling.com\/wp-content\/uploads\/2026\/05\/used-oil-refineries-for-sale.png\" alt=\"Waste oil re-refining plant equipment and project scope\"\/><figcaption class=\"wp-element-caption\">\nThe equipment package and the customer's existing site infrastructure together determine the remaining project scope.\n<\/figcaption><\/figure>\n\n\n\n<h2 id=\"equipment-vs-project\" class=\"wp-block-heading\">Equipment Price vs Remaining Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">The easiest way to avoid confusion is to separate the project into two sides.<\/p>\n\n\n\n<div class=\"vbolt-compare-grid\">\n\n<div class=\"vbolt-compare-card\">\n<h3>Equipment Supplier Scope<\/h3>\n<ul>\n<li>agreed process equipment;<\/li>\n<li>vacuum and condensation systems;<\/li>\n<li>pumps and controls;<\/li>\n<li>selected auxiliary equipment;<\/li>\n<li>agreed commissioning support.<\/li>\n<\/ul>\n<\/div>\n\n<div class=\"vbolt-compare-card\">\n<h3>Customer \/ Site Scope<\/h3>\n<ul>\n<li>existing or new storage tanks;<\/li>\n<li>utility connections;<\/li>\n<li>foundations and local piping;<\/li>\n<li>installation resources;<\/li>\n<li>other site infrastructure.<\/li>\n<\/ul>\n<\/div>\n\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">The exact boundary changes from project to project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For example, one customer may already have suitable feed and product tanks. Another may want these included as part of a broader supply package.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The same applies to heating, cooling and installation support.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The important point is that these responsibilities are clear before the customer treats the equipment quotation as the final project budget.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">For projects requiring a wider supply scope, see our <a href=\"https:\/\/vboltoilrecycling.com\/turnkey-used-oil-re-refining-plant\/\" target=\"_blank\" rel=\"noopener\"><strong>Turnkey Used Oil Re-Refining Plant<\/strong><\/a> guide.<\/p>\n\n\n\n<h2 id=\"project-check\" class=\"wp-block-heading\">A Simple Pre-Quote Project Check<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">Before asking for the final quotation, the customer can complete a simple site check.<\/p>\n\n\n\n<div class=\"vbolt-table-wrap\">\n<table class=\"vbolt-check-table\">\n<thead>\n<tr>\n<th>Project Item<\/th>\n<th>Already Available?<\/th>\n<th>Still Required?<\/th>\n<\/tr>\n<\/thead>\n\n<tbody>\n<tr>\n<td>Feedstock storage<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Product storage<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Electrical supply<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Heating source<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Cooling system<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Equipment foundation<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Local piping and cabling<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n\n<tr>\n<td>Installation team<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<td>\u25a1 Yes &nbsp; \u25a1 No<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<\/div>\n\n\n\n<p class=\"wp-block-paragraph\">This gives both the customer and the equipment supplier a much clearer starting point.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It also avoids repeating a broader question already covered in our <a href=\"https:\/\/vboltoilrecycling.com\/waste-oil-recycling-plant-cost\/\" target=\"_blank\" rel=\"noopener\"><strong>Waste Oil Recycling Plant Cost<\/strong><\/a> guide, which explains the main factors that affect overall investment.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">This article has a narrower purpose: identifying how much of the project already exists and how much still needs to be built.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img decoding=\"async\" src=\"https:\/\/vboltoilrecycling.com\/wp-content\/uploads\/2026\/05\/used-engine-oil-refining-machine.png\" alt=\"Used oil refining equipment prepared for installation\"\/><figcaption class=\"wp-element-caption\">\nThe final investment depends on how the supplied equipment connects with the tanks, utilities and installation work available at the project site.\n<\/figcaption><\/figure>\n\n\n\n<h2 id=\"vbolt-review\" class=\"wp-block-heading\">How VBOLT Reviews the Project Scope<\/h2>\n\n\n\n<p class=\"wp-block-paragraph\">When we receive a waste oil distillation project inquiry, capacity alone is not enough to define the supply scope.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is also useful to know:<\/p>\n\n\n\n<ul class=\"wp-block-list\">\n<li>what waste oil will be processed;<\/li>\n\n\n\n<li>the required daily capacity;<\/li>\n\n\n\n<li>the target product;<\/li>\n\n\n\n<li>the installation country;<\/li>\n\n\n\n<li>which tanks are already available;<\/li>\n\n\n\n<li>which utilities already exist;<\/li>\n\n\n\n<li>which parts of the project the customer wants VBOLT to supply.<\/li>\n<\/ul>\n\n\n\n<p class=\"wp-block-paragraph\">This allows us to separate the required equipment package from the facilities that the customer can continue using locally.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Customers comparing several equipment manufacturers can also refer to our <a href=\"https:\/\/vboltoilrecycling.com\/waste-oil-recycling-plant-supplier\/\" target=\"_blank\" rel=\"noopener\"><strong>Waste Oil Recycling Plant Supplier Comparison Guide<\/strong><\/a>.<\/p>\n\n\n\n<div class=\"vbolt-cta-box\">\n\n<h2>Planning a Waste Oil Distillation Project?<\/h2>\n\n<p>Tell us what waste oil you plan to process, the required capacity and which tanks, utilities and site facilities you already have.<\/p>\n\n<p>We can help identify what should be included in the VBOLT equipment scope and what can continue to be provided by your existing facility.<\/p>\n\n<p><strong>Order &amp; Project Support<\/strong><\/p>\n\n<p>\n<a class=\"vbolt-cta-button\" href=\"javascript:asfrom();\">Review My Project Scope<\/a>\n<\/p>\n\n<\/div>\n\n\n\n<h2 id=\"faq\" class=\"wp-block-heading\">Frequently Asked Questions<\/h2>\n\n\n\n<h3 class=\"wp-block-heading\">Why can similar waste oil distillation equipment result in different total investments?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Because each customer starts with different site conditions. An existing facility may already have tanks, utilities and operators, while a new project may need to build most of these facilities.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Can an existing waste oil facility reduce the investment required for a new distillation plant?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Yes, if the existing tanks, utilities and site infrastructure are suitable for the new process equipment.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Does the equipment quotation equal the total project investment?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Not necessarily. The quotation covers the agreed supplier scope. The total investment also depends on what already exists at the site and what still needs to be provided locally.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">What information should I provide when requesting a project quotation?<\/h3>\n\n\n\n<p class=\"wp-block-paragraph\">Provide the waste oil type, required capacity, target product, installation country and a brief description of the tanks, utilities and infrastructure already available.<\/p>\n\n\n\n<script type=\"application\/ld+json\">\n{\n  \"@context\": \"https:\/\/schema.org\",\n  \"@type\": \"FAQPage\",\n  \"mainEntity\": [\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Why can similar waste oil distillation equipment result in different total investments?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Because each customer starts with different site conditions. An existing facility may already have tanks, utilities and operators, while a new project may need to build most of these facilities.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Can an existing waste oil facility reduce the investment required for a new distillation plant?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Yes, if the existing tanks, utilities and site infrastructure are suitable for the new process equipment.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"Does the equipment quotation equal the total project investment?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Not necessarily. The quotation covers the agreed supplier scope. The total investment also depends on what already exists at the site and what still needs to be provided locally.\"\n      }\n    },\n    {\n      \"@type\": \"Question\",\n      \"name\": \"What information should I provide when requesting a project quotation?\",\n      \"acceptedAnswer\": {\n        \"@type\": \"Answer\",\n        \"text\": \"Provide the waste oil type, required capacity, target product, installation country and a brief description of the tanks, utilities and infrastructure already available.\"\n      }\n    }\n  ]\n}\n<\/script>\n\n\n\n<style>\n#rank-math-toc {\n  background: #f7f7f7;\n  border: 1px solid #e4e4e4;\n  border-radius: 6px;\n  padding: 12px 16px;\n  margin: 24px 0;\n  font-size: 13px;\n}\n\n#rank-math-toc summary.toc-header {\n  display: flex;\n  justify-content: space-between;\n  align-items: center;\n  cursor: pointer;\n  list-style: none;\n}\n\n#rank-math-toc summary::-webkit-details-marker {\n  display: none;\n}\n\n.toc-title {\n  font-size: 15px;\n  font-weight: 700;\n}\n\n#rank-math-toc nav {\n  margin-top: 10px;\n}\n\n#rank-math-toc nav ul {\n  margin: 0;\n  padding-left: 18px;\n}\n\n#rank-math-toc nav li {\n  margin: 4px 0;\n}\n\n#rank-math-toc nav a {\n  color: inherit;\n  text-decoration: none;\n}\n\n#rank-math-toc nav a:hover {\n  text-decoration: underline;\n}\n\n.wp-block-image {\n  margin: 26px 0;\n}\n\n.wp-block-image img {\n  width: 100%;\n  height: auto;\n  border-radius: 5px;\n}\n\n.wp-element-caption {\n  margin-top: 7px;\n  font-size: 12px;\n  line-height: 1.5;\n  color: #666;\n}\n\n.vbolt-table-wrap {\n  width: 100%;\n  overflow-x: auto;\n  margin: 24px 0;\n  -webkit-overflow-scrolling: touch;\n}\n\n.vbolt-project-table,\n.vbolt-check-table {\n  width: 100%;\n  min-width: 680px;\n  border-collapse: collapse;\n  background: #ffffff;\n  font-size: 14px;\n  line-height: 1.55;\n}\n\n.vbolt-project-table th,\n.vbolt-check-table th {\n  background: #f2f4f5;\n  border: 1px solid #d9d9d9;\n  padding: 12px 14px;\n  text-align: left;\n  font-weight: 700;\n}\n\n.vbolt-project-table td,\n.vbolt-check-table td {\n  border: 1px solid #e0e0e0;\n  padding: 12px 14px;\n  vertical-align: top;\n}\n\n.vbolt-project-table tbody tr:nth-child(even),\n.vbolt-check-table tbody tr:nth-child(even) {\n  background: #fafafa;\n}\n\n.vbolt-compare-grid {\n  display: grid;\n  grid-template-columns: repeat(2, minmax(0, 1fr));\n  gap: 18px;\n  margin: 24px 0;\n}\n\n.vbolt-compare-card {\n  padding: 20px;\n  border: 1px solid #dedede;\n  border-radius: 6px;\n  background: #fafafa;\n}\n\n.vbolt-compare-card h3 {\n  margin-top: 0;\n  margin-bottom: 12px;\n  font-size: 17px;\n}\n\n.vbolt-compare-card ul {\n  margin: 0;\n  padding-left: 20px;\n}\n\n.vbolt-compare-card li {\n  margin-bottom: 6px;\n}\n\n.vbolt-cta-box {\n  margin: 32px 0;\n  padding: 24px;\n  border: 1px solid #dedede;\n  border-radius: 6px;\n  background: #fafafa;\n}\n\n.vbolt-cta-box h2 {\n  margin-top: 0;\n}\n\n.vbolt-cta-button {\n  display: inline-block;\n  padding: 11px 20px;\n  border: 1px solid currentColor;\n  border-radius: 4px;\n  text-decoration: none;\n  font-weight: 700;\n}\n\n@media (max-width: 767px) {\n  .vbolt-compare-grid {\n    grid-template-columns: 1fr;\n  }\n\n  .vbolt-project-table,\n  .vbolt-check-table {\n    min-width: 640px;\n    font-size: 13px;\n  }\n}\n<\/style>\n\n\n\n<script>\ndocument.addEventListener('DOMContentLoaded', function() {\n  var tocDetails = document.getElementById('rank-math-toc');\n  var tocArrow = document.getElementById('tocArrow');\n\n  if (tocDetails && tocArrow) {\n    tocDetails.addEventListener('toggle', function() {\n      tocArrow.textContent = tocDetails.open ? '\u25b4' : '\u25be';\n    });\n  }\n});\n<\/script>\n","protected":false},"excerpt":{"rendered":"<p>For a waste oil distillation project, the more useful budgeting question is not simply how much the machine costs, but how much of the complete project still has to be built around it. That answer can be very different from one customer to another. Some sites already have suitable tanks, utilities and operating infrastructure, while [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[8],"tags":[],"class_list":["post-1834","post","type-post","status-publish","format-standard","hentry","category-blog"],"_links":{"self":[{"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/posts\/1834","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/comments?post=1834"}],"version-history":[{"count":2,"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/posts\/1834\/revisions"}],"predecessor-version":[{"id":1836,"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/posts\/1834\/revisions\/1836"}],"wp:attachment":[{"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/media?parent=1834"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/categories?post=1834"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/vboltoilrecycling.com\/ru\/wp-json\/wp\/v2\/tags?post=1834"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}